RapidLL Uptime Report - Q1 2021

Uptime Quarterly Reports are published each quarter to provide a comprehensive view of our uptime performance as measured over the last three (3) months and twelve (12) months. The report measures our performance as defined in the Service Level Agreement.

 

The uptime measured on a rolling 12 months basis April 2020 - March 2021 is 100%

The uptime measured on a rolling 3 months basis January 2021 - March 2021 is 100%

Please note our System Uptime Status page, which allows our customers to view the current status of their instance/environment at any time, using the following link: http://status.exlibrisgroup.com

 

clipboard_e9a98cc64363991b2ab821f828ecdf9e3.png

 

 

Unscheduled downtime incidents in Q1 2021

Date

Start time

[CDT]

End time

[CDT]

Duration (minutes)

Description

         

Scheduled downtimes during maintenance windows in Q1 2021

Start Date

Start Time

[CDT]

End Time

[CDT ]

Duration (Minutes)

January 17, 2021 11:32 PM 11:45 PM 13
March 19, 2021 12:17 AM 12:36 AM 19
March 27, 2021 12:24 AM 01:33 AM 69

 

Total unscheduled downtime minutes during past 12 months

 

Quarter

Total unscheduled downtime in Quarter (minutes)

Q2 2020 0
Q3 2020 0
Q4 2020 0
Q1 2021 0

 

 

How is Uptime Calculated?

The uptime calculation is based on the following calculation (as defined in the Service Level Agreement):

"Uptime" means the total period in minutes during which the Service is available for access and use during this period.

 

Uptime Percentage” means Uptime expressed as a percentage, calculated in accordance with the following formula:

Uptime Percentage = X /(Y–Z) × 100

Where:

X = Uptime

Y = Last 12 months period

Z = The duration (in minutes) of any SLA Exclusions* during these 12 months

 

*SLA exclusions are defined in the contract SLA (e.g. Scheduled maintenance, etc.)

 

Further Information

If you have any queries on the information within this report please contact Ex Libris through your usual channel.

April 13, 2019April 13, 2019